DraftBuilt by Amos —amos@drivearchipelago.com
Lot 47/ Frame 5PA
Turbine intake assembly with mountain backdrop, Utah
Available now · Utah, USA

Unused 30 MW
GE Frame 5PA
Gas Turbine Generator.

Manufactured 2014. Never installed. GE-preserved in original crates. Dry Low NOx, 60 Hz, 13.8 kV. Located in Utah.

Net output
30MW
Frequency
60Hz
Voltage
13,800V
Year built
2014
01 / Provenance

30 MW of dispatchable capacity, without the lead time.

New Frame 5-class units are currently quoted at multi-year lead times. This one is on the ground in Utah, in original GE crates, ready to ship and commission against an aggressive schedule — exactly the kind of block hyperscale data centers, IPPs, and large industrial loads need to bring online today.

Manufactured by GE in 2014 and never installed. The Frame 5PA is the modern iteration of GE's heavy-duty Frame 5 lineage — an industrial workhorse that has logged tens of millions of hours in oil & gas, utility, and grid-scale service.

Preserved by GE for long-term storage and equipped with Dry Low NOx combustion. Meets current North American grid and emissions standards out of the box, with full factory documentation included.

Condition
Unused — never installed
Operating hours
0
Storage
GE long-term preservation
Origin
OEM build, General Electric
Documentation
Complete, factory-issued
Asking
POA
02 / Configuration

Single-shaft heavy-duty package.

Turbine, generator, auxiliary skid, and balance-of-plant — packaged and tagged by the original equipment manufacturer. Isometric view from the GE submittal drawings is included in the diligence package.

Isometric view of the complete turbine generator package

Fig. 01 · Isometric view, GE Frame 5PA package

04 / Specifications

Full technical record.

Headline specs at a glance. Complete data sheets, drawings, and commissioning records are part of the diligence package.

Turbine generator package
OEM
General Electric
Model
Frame 5PA
Designation
MS5001
Configuration
Single-shaft, heavy-duty industrial
Net output
30 MW
Fuel
Natural gas
Frequency
60 Hz
Voltage
13,800 V
Combustion
Dry Low NOx (DLN)
Emissions compliance
North American grid + modern emissions
Year of manufacture
2014
Provenance & condition
Operating hours
0 — never commissioned
Storage
GE long-term preservation, in original crates
OEM
Original General Electric build
Documentation
Complete factory data, TPI, TPC packages
05 / Location

Stored in the high desert.

On-site inspections welcomed by appointment. Heavy-haul transport and load-out logistics arranged on request.

Region

Utah, United States

Lat / Long disclosed under NDA

Access

Hard-stand storage pad

Crane access · Heavy-haul approved

Inspection by appointment

Logistics

Heavy-haul transport

North America · Marine export

Quoted on request

Storage status

In original GE crates

Long-term preservation

Documented condition

06 / Diligence

The full record, available to qualified buyers.

Three details, one click. We’ll route the data sheets, drawings, packing lists, and commissioning records to your inbox and follow up to coordinate inspection or further questions.

  • PDFTurbine data sheet
  • PDFGenerator data sheet
  • XLSCargo packing list — 2014
  • XLSCargo packing list — 2015
  • DriveDrawings & dimensions
  • DropboxInstallation & commissioning records (DATA, TPI, TPC)
Request access

Diligence package — 30 MW GE Frame 5PA

Submitted to a member of the principal team. No lists, no forwarding.

We respond within one business day.