
Unused 30 MW
GE Frame 5PA
Gas Turbine Generator.
Manufactured 2014. Never installed. GE-preserved in original crates. Dry Low NOx, 60 Hz, 13.8 kV. Located in Utah.
30 MW of dispatchable capacity, without the lead time.
New Frame 5-class units are currently quoted at multi-year lead times. This one is on the ground in Utah, in original GE crates, ready to ship and commission against an aggressive schedule — exactly the kind of block hyperscale data centers, IPPs, and large industrial loads need to bring online today.
Manufactured by GE in 2014 and never installed. The Frame 5PA is the modern iteration of GE's heavy-duty Frame 5 lineage — an industrial workhorse that has logged tens of millions of hours in oil & gas, utility, and grid-scale service.
Preserved by GE for long-term storage and equipped with Dry Low NOx combustion. Meets current North American grid and emissions standards out of the box, with full factory documentation included.
- Condition
- Unused — never installed
- Operating hours
- 0
- Storage
- GE long-term preservation
- Origin
- OEM build, General Electric
- Documentation
- Complete, factory-issued
- Asking
- POA
Single-shaft heavy-duty package.
Turbine, generator, auxiliary skid, and balance-of-plant — packaged and tagged by the original equipment manufacturer. Isometric view from the GE submittal drawings is included in the diligence package.

Fig. 01 · Isometric view, GE Frame 5PA package
On-site documentation, as preserved.
26 frames


























Full technical record.
Headline specs at a glance. Complete data sheets, drawings, and commissioning records are part of the diligence package.
- OEM
- General Electric
- Model
- Frame 5PA
- Designation
- MS5001
- Configuration
- Single-shaft, heavy-duty industrial
- Net output
- 30 MW
- Fuel
- Natural gas
- Frequency
- 60 Hz
- Voltage
- 13,800 V
- Combustion
- Dry Low NOx (DLN)
- Emissions compliance
- North American grid + modern emissions
- Year of manufacture
- 2014
- Operating hours
- 0 — never commissioned
- Storage
- GE long-term preservation, in original crates
- OEM
- Original General Electric build
- Documentation
- Complete factory data, TPI, TPC packages
Stored in the high desert.
On-site inspections welcomed by appointment. Heavy-haul transport and load-out logistics arranged on request.
Utah, United States
Lat / Long disclosed under NDA
Hard-stand storage pad
Crane access · Heavy-haul approved
Inspection by appointment
Heavy-haul transport
North America · Marine export
Quoted on request
In original GE crates
Long-term preservation
Documented condition
The full record, available to qualified buyers.
Three details, one click. We’ll route the data sheets, drawings, packing lists, and commissioning records to your inbox and follow up to coordinate inspection or further questions.
- PDFTurbine data sheet
- PDFGenerator data sheet
- XLSCargo packing list — 2014
- XLSCargo packing list — 2015
- DriveDrawings & dimensions
- DropboxInstallation & commissioning records (DATA, TPI, TPC)
Diligence package — 30 MW GE Frame 5PA
Submitted to a member of the principal team. No lists, no forwarding.